Additional Equipment and services, deliverable upon agreement
Lightening-
Perimetry lights, flood lights and illuminated wind sock, ex or strd as required.
Assembly -
Due to extreme transport costs on assembled helidecks it is advantageous to do the assembly at the client`s yard. Kapp Aluminium can provide a supervisor or the entire assembly crew. The assembly will normally take no more than 3 weeks.
Firefighting Equipment -
Monitors, extinguishers, deck integrated fire fighting systems and rescue equipment as required by client and actual regulations.
Piping for Firefighting Equiment -
Prefabricated.
Piping for drainage -
Piping from the gutter to an agreed point.
Platforms etc -
Platforms for firefighting equipment, stairs, ladders and walkways for helideck access and escape routes.
Support Structure Design -
Design and class approval for fabrication by client.
Support Structure -
Prefabrication of support structure to plane frames. The element size is limited to fit road transport. Assemly at customer`s yard.